Sable car GAZ-2752, 2217, 2310>> Power supply system>> Removal and filter settler dismantling

Removal and filter settler dismantling

 PERFORMANCE ORDER

Key «on 17» we turn on from the filter case a stopper and we merge a fuel sediment. Between the case and a stopper the copper washer is established.

Key «on 14» we turn on unions of the bringing …

… and taking away топливопроводов.

Key «on 17» we turn on two nuts of bolts of fastening of the case of the filter to a frame, holding bolts a key «on 14»...

… also we remove the filter settler from a frame longeron.

We mark mutual position of the case of the filter settler and its cover with unions.

Key «on 10» we turn on four bolts of fastening of an arm to the case.

We uncover also an arm.

We wash out a filter settler glass from dirt and deposits.

We remove rubber laying of a cover.

By flat-nose pliers and screw-driver it is taken out fixing spring washer, …

… we remove a spring and a set of plates of a filtering element.

We wash out the removed details (except laying) in solvent, we collect and we establish the filter settler in return sequence.